Risks
A single risk register for the "Quality" layer: a collection with a schema and a contour, what counts as a risk and how to rate it, three norms: a risk has an owner, a rating, a signal and a measure; an accepted risk is accepted with a reason; ratings are reviewed by a judge.
Risks
One risk register per project: agents, technology, access, data, people, the deal. The collection /quality/risks (type SystemRisk) and its contour (open → mitigated, accepted, occurred or closed) come from the "Quality" layer of an earlier product, where the register holds a hundred risks; the labels are generalized here. The page What a risk is draws the border with a bug, a task and a decision and says which risk is serious.
Norms
- RSK-R01: a live risk has an owner, a probability, a severity, a signal and a measure. The enforcer is the
risk-heldcheck. - RSK-R02: an accepted risk is accepted with a reason (
acceptedBecause) or a decision (decision). The enforcer is therisk-acceptedcheck. - RSK-R03: ratings are reviewed against facts. The enforcer is a judge (
judges/risk-review.md): the person responsible for quality, or a reviewing agent they appoint. The mode is "watches".
Whether a serious risk is covered by a test is a norm of the testing package.
Where the boundary is
- A risk that came true is a bug or an incident (the
bugspackage); a measure is a task (thetaskspackage); a decision to accept a risk is a record of thedecisionspackage. - The bridge fields into the "Product", "Technology", "Deal", "Business" and "Knowledge" layers sleep while those layers are absent.
Which lenses are needed
The package brings no lenses. Needed: a risk map "probability × severity" with filters by category and state; a list of serious unclosed risks with coverage (tests, indicators, decision).